Enbridge Northern Gateway

Conducted 4-way grid sweep for geotechnical borehole and borehole access on 60 locations of the proposed Northern Gateway pipeline between Grande Prairie and Edmonton Alberta.

 

Inter Pipeline Polaris CLX-2

Conducted 7-way grid sweep, tied in locations for preliminary construction, right of way clearing, route assessment and crossing establishment purposes on 70 km of pipeline right of way on behalf of the pipeline owner. The project was located between Bonnyville and Conklin Alberta.

 

Enbridge WPE

Conducted preliminary depth of cover surveys for the route selection process, also staked and provided depth readings for all crossings to assist preliminary survey between Cheecham and Edmonton Alberta.

 

Inter Pipeline Polaris PX-6, PX-9, PX-11

Conducted 7-way grid sweep, tied in locations for the pipeline constructions on a combined 618 km of pipeline right of way on behalf of the pipeline owner. The project was located in Alberta from Lamont to Christina Lake, Edmonton to Lamont, and Conklin to Foster Creek.

 

Shell Quest

Conducted 4-way grid sweep on 80 km of pipeline right of way, preliminary staking, survey assistance, sweeping for grading and construction on the Shell carbon capture pilot project between Redwater and Edmonton Alberta.

 

Interpipeline FCCL-Cold Lake Air Weapons Range

Conducted 7-way grid on 80 km of pipeline right of way located on the CFB Cold Lake Air Weapons Range on behalf of the pipeline owner.

 

Inter Pipeline CLX-3

Conducted Survey locates, sweeps, staking, depth profile locates, route assessment, sweeps for brushing, as well as pre-construction sweeps for 285 km of pipeline right of way between Hardisty and La Corey Alberta.

 

Enbridge Bakken Pipeline

Performed sweeps and staking for construction survey assistance for crossing depth profiles, route planning, crossing inventory, and lay-down areas.  Additionally sweeps and staking were performed for pipeline, post job cleanup.

 

Plains Midstream Rainbow II

Conducted 7-way grid sweep on 284 km of pipeline right of way.  Performed survey assistance, construction, sweeping and line staking between Edmonton and Nipisi Alberta.